As the digital economy continues to grow at a rapid speed, data enter has become the “digital heart” supporting advanced technologies such as AI, cloud computing, and blockchain. These centers play a pivotal role in the operation of society and are now critical infrastructure.
According to the Global Data Center Market Report, global electricity demand for data centers is predicted to grow by 56% over the next five years. However, the traditional power system construction models struggle to meet the fast growing computational needs and carbon-neutral goals, which presents a challenge fro the speed, operational efficiency, and energy management required in data center development.
In this wave of global digital transformation, data center solution with three core concept, modular design, intelligent management system, and green, low-carbon features, has become the standard choice for large-scale data center construction and show strong adaptability for edge computing nodes.
EVADA Dimension Series Data Center Solution, unlike traditional power supply systems, aligns perfectly with the need of flexible expansion, with power modules designed and produced beforehand and quickly assembled on-site. These modules can be configured based on actual load requirements and assembled into complete units, matching the growing demands of data centers.

Efficiency Revolution
Compared to resource-intensive and time-consuming traditional power system, our data center solution move 80% of the construction to the factory, greatly improved delivery efficiency.
Speedy Delivery: With beforehand production and standardized approach, the construction cycle is shortened by 70%, from 120 days to just 30 days, which boosts construction efficiency by 300%, significantly reducing deployment complexity and giving companies a critical competitive advantage in the digital economy.
Cost Reconfiguration: Standardized factory production reduces material waste by 30%, cuts labor costs by 50%, and, through modular design, optimized total lifecycle costs, bringing a 15%-20% cost reduction over the system’s lifespan.
Space Optimization: The integrated module design, high-density component integration, and 3D simulation for layout optimization reduce power system space by over 30%, freeing up more room for data centers.
Reliable Assurance
Through comprehensive quality control and intelligent monitoring technology, EVADA Dimension Data Center Solution ensure continuous and reliable power supply, with core power conversion adopting EVADA HQ-M Series Modular UPS.
Standardized Modules: The all-in-one, fully functional design ensures high protection, completeness, and consistency in delivery. Intelligent monitoring and AI-driven simulation provide predictive maintenance, protecting the system and ensuring stable operations.
Strict Quality Control: Each module undergoes a 72-hour full load test at the factory. The failure rate is reduced by 85% compared with on-site construction, and the MTBF (Mean Time Between Failure) exceeds 100,000 hours.
Predictive Protection: AI algorithms predict faults by monitoring over 200 parameters, including temperature, harmonics, and insulation status, reducing response times from hours to seconds.
Disaster Recovery: The modular architecture supports N+1 redundancy and quick module replacement, ensuring no service interruptions even during failures.

Flexible Expansion
The Dimension Series Data Center Solutions integrate modular design principles, with seamless system cabinet combinations and factory-prefabricated copper bar connections, reducing on-site connection points by 30% and ensuring higher delivery quality.
These modules' standardized interfaces support modular assembly, enabling elastic power capacity expansion to avoid upfront investments. Moreover, they are adaptable to diverse requirements, including edge computing and AI-powered systems, with customized solutions for rapid deployment.
Green Performance
The Dimension Series Data Center Solutions support carbon reduction throughout their lifecycle, aiding data centers in achieving ESG goals. Combined with AI-based energy efficiency systems, they optimize power distribution, reducing the data center's PUE to 1.06, approaching theoretical limits.
Manufacturing Phase: Factory production increases steel utilization to 95%, reducing construction waste by 80%.
Operational Phase: Multi-source energy input (wind, solar, etc.) reduces electricity costs through peak and off-peak price arbitrage, saving on operational costs annually.
Project Cases

A Public Security Data Center Project: The integration of 20 units of 600kVA modular UPS (including input distribution, UPS, and output distribution) created a 2.5MW system, greatly reducing construction costs and space usage.
Telecommunication Company Project: The data center is an important fulcrum for the development of the digital economy in Northeast China, covering a total area of 1,294 acres, with a planned total area of about 596,000 square meters and a planned total installed rack of 54,000 racks. EVADA provides 2 units of 600kVA modular UPS to form a flexible and efficient 1.25MW power system.
EVADA Dimension Series Data Center Solutions is not just a technological upgrade; it represents a paradigm shift from engineering-driven to product-driven data center solutions. Through breakthroughs in efficiency, reliability, flexibility, and sustainability, it infuse resilience into digital infrastructure.